How a project runs

Slowly and specifically. The order below is the whole method — plan before selection, selection before ordering, and a schedule honest enough that the install is uneventful.

The stages

01

Brief

The rooms, the stage the project is at, and anything already fixed — a date, a builder, pieces that are staying.

02

Plan

Layouts and furniture plans first. Nothing gets selected until the room works at plan level.

03

Selections

Finishes, fabrics and FF&E curated as one palette, then sampled and specified room by room.

04

Schedule

Everything on one schedule with lead times against it, so ordering happens in the sequence the site can actually build.

05

Install

Deliveries sequenced, damages and snags chased, then a final styling pass once the room is standing.

What holds throughout

Restraint
Fewer pieces, chosen properly. A room reads calm when nothing in it is fighting for attention.
Material
Surfaces that record time instead of resisting it, sampled in the room's own light before anything is ordered.
Follow-through
Drawings, schedules, deliveries and snag lists. A design is only as good as the install that lands it.